The ability to increase the amperage per phase depends on the current infrastructure and local network's capacity. You'll need to contact Scottish Power directly or complete a "Change to your electricity supply" form online. They'll conduct an assessment and possibly liaise with your local Distribution Network Operator. Please note there may be a charge for this service and subsequent works. If your local network can handle the increased demand, and with the necessary alterations, it should technically be possible to increase to 100 amps per phase. Always consult with a professional before proceeding.
Demandé Mar 25, 2024 10:57 AM